FixVault

Backup Unit: Installation

  1. Install the backup unit.

    Tightening torque: 

    7.5 N.m (0.8 kgf-m, 5.5 ft-lb)

  2. Install the tray center UPR.
  3. Install the cover assembly front and the console box assembly.
  4. Install the heater control panel assembly.
  5. Connect the battery ground terminal. Ref. to REPAIR CONTENTS>NOTE>BATTERY .