FixVault

Power Rear Gate Drive Unit: Installation

  1. Install the power rear gate drive unit (PRG D/U).

    Tightening torque: 

    25 N.m (2.5 kgf-m, 18.4 ft-lb)

  2. Install the trim panel - rear apron LH and trim panel - rear quarter pillar UPR rear LH PRG.
  3. Install the rod - power rear gate. Ref. to POWER REAR GATE SYSTEM>Power Rear Gate Rod>INSTALLATION .
  4. Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .