FixVault

Pitching Stopper

  1. Install the pitching stopper.

    Tightening torque: 

    T1: 50 N.m (5.1 kgf-m, 36.9 ft-lb)

    T2: 58 N.m (5.9 kgf-m, 42.8 ft-lb)

    G10268113Courtesy of SUBARU OF AMERICA, INC.
  2. Install the intercooler. Refer to INTAKE (INDUCTION) (EXCEPT FOR STI)>INTERCOOLER>INSTALLATION .
  3. Install the collector cover. Refer to INTAKE (INDUCTION) (EXCEPT FOR STI)>COLLECTOR COVER>INSTALLATION .
  4. Connect the ground terminal to battery sensor. Refer to NOTE>NOTE>BATTERY .