FixVault

Front Fog Light Assembly: Installation

CAUTION: Install the mud guard front so that the front end of the mud guard (b), except for the clip fixing point, comes inside the bumper face (a).
G13200802Courtesy of SUBARU OF AMERICA, INC.
  1. Install the fog light assembly front.

    Tightening torque: 

    7.5 N.m (0.8 kgf.m, 5.5 ft.lb)

  2. Install the mud guard front.
  3. Lower the vehicle.
  4. Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .
  5. Adjust the fog light beam. Ref. to LIGHTING SYSTEM>Front Fog Light Assembly>ADJUSTMENT>FOG LIGHT AIMING .