Front Door Glass: Installation
- Install the glass - front door partition.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the running channel - front door and the sash COMPL - partition.CAUTION: Check that the running channel - front door is securely fixed to the panel assembly - front door and to the sash COMPL - partition.
- Install the glass assembly - front door.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the front door inner pad.
- Install the sealing cover - front door.
- Install the trim panel - front door.
- Connect the battery ground terminal. Refer to NOTE>NOTE>BATTERY .