FixVault

Pre-Delivery Inspection (PDI) Procedure: Battery

Check the battery terminals to make sure that there are no rust or corrosion due to fluid leaks.

Check that the battery caps are securely tightened.

G13639898Courtesy of SUBARU OF AMERICA, INC.