  1. Install the pitching stopper bracket.
    1. Install the pitching stopper bracket.

      Tightening torque: 

      41 N.m (4.2 kgf-m, 30.2 ft-lb)

      G13621925Courtesy of SUBARU OF AMERICA, INC.
    2. Install the bolts which secure the CVTF cooler pipe No. 1.

      Tightening torque: 

      16 N.m (1.6 kgf-m, 11.8 ft-lb)

      G13621995Courtesy of SUBARU OF AMERICA, INC.
  2. Install the pitching stopper.
    NOTE: Install with the front mark (a) facing towards the front of the vehicle.

    Tightening torque: 

    T1: 50 N.m (5.1 kgf-m, 36.9 ft-lb)

    T2: 58 N.m (5.9 kgf-m, 42.8 ft-lb)

    Fig 1: Pitching Stopper Nut And Bolt With Torque Specification
    G13621930Courtesy of SUBARU OF AMERICA, INC.
  3. Connect the ground cord.

    Tightening torque: 

    32.3 N.m (3.3 kgf-m, 23.8 ft-lb)

  4. Install the air breather hose to the clip.
  5. Install the intercooler. Ref. to INTAKE (INDUCTION) (H4DOTC)>INTERCOOLER>INSTALLATION .