FixVault

Oil Pan Upper

  1. Install the stud bolt (B).

    Tightening torque: 

    10 N.m (1.0 kgf-m, 7.4 ft-lb)

  2. Install the baffle plate (A).

    Tightening torque: 

    6.4 N.m (0.7 kgf-m, 4.7 ft-lb)

    G14601501Courtesy of SUBARU OF AMERICA, INC.
  3. Install the oil level switch. Ref. to LUBRICATION (H4DOTC)>OIL LEVEL SWITCH>INSTALLATION .
  4. Install the thermostat. Ref. to COOLING (H4DOTC)>THERMOSTAT>INSTALLATION>ENGINE SIDE .
  5. Install the water pump assembly. Ref. to COOLING (H4DOTC)>WATER PUMP>INSTALLATION .