FixVault

Intelligent Switching Unit (ISU) Installation

  1. Install the ISU with the nuts.
  2. Connect the electrical connectors.
    Fig 1: Installing ISU With Nuts
    G04096565Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the knee bolster. Refer to "DRIVER'S SIDE KNEE BOLSTER INSTALLATION ".
  4. Install the instrument panel under cover, Refer to "INSTRUMENT PANEL INSTALLATION ".
  5. Connect the negative battery connector.
    Fig 2: Installing Knee Bolster
    G04096566Courtesy of SUZUKI OF AMERICA CORP.