FixVault

Intake EGR Pipe Installation

  1. Installation should follow the removal procedure in the reverse order.
  2. Install the intake EGR pipe.

    Tighten: 

    Tighten the intake EGR pipe retaining bolts to 8 - 12 N.m (71 - 106 lb-in.).