FixVault
Home
›
Suzuki
›
2012
›
Equator Base
›
Repair and Diagnosis
›
Heating, Ventilation & A/C (HVAC)
›
HVAC Control Systems
›
Ventilation System
›
Repair Instructions
›
Control Unit: Removal and Installation
›
Front Air Control
›
Installation
Front Air Control: Installation
Installation is in the reverse order of removal.