FixVault

Starter Assembly: Remove, Install, and Overhaul

Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
w/o Twin Cam Eng1.5B
w/Twin Cam Eng2.1B
Combination Procedure: STARTER FIELD COILS: Remove & Replace:
0.4B