FixVault

Starter Assembly: Remove, Install, and Overhaul

Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
3S-FE Eng,w/Twin Cam Eng1.3B
3S-GELC Eng,3S-GTE Eng,w/Twin Cam Eng1.6B
w/o Twin Cam Eng1.3B
Combination Procedure: STARTER FIELD COILS: Remove & Replace:
0.4B