FixVault

Inspection Procedure

  1. Check Door Unlock Detection Switch. See Step 5 Or 6 Of  INSPECTION  in POWER DOOR LOCK CONTROL SYSTEM. 
    1. NG: Replace the door lock assembly. 
    2. OK: Go to next step. 
  2. Check Wire Harness And Connector Between Door Unlock Detection Switch And Body Ground. See  HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE  . 
    1. NG: Repair or replace wire harness or connector. 
    2. OK: Proceed to next circuit inspection shown on problem symptoms table. See  PROBLEM SYMPTOMS TABLES  .