FixVault

Inspection Procedure

WARNING: This page is about a different car, the 2003 Toyota Sequoia. However, it is still accessible from the selected car via links, so may be relevant.
  1. Check voltage between terminal PI and GND of ECM connector. 

    PREPARATION:

    Turn ignition switch ON.

    CHECK:

    Measure voltage between terminals PI and GND of ECM connector when main switch is held on and off.

    OK:

    SWITCH VOLTAGE REFERENCE

    Switch position Voltage
    OFF 9 - 14 V
    ON 0 -3 V
    Fig 1: Measuring Voltage Between Terminals PI And GND Of ECM Connector
    G02838756Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. OK : Proceed to next circuit inspection shown on problem symptom table (See  PROBLEM SYMPTOMS TABLE  ). 
    2. NG : Go to Next Step 
  2. Check combination meter (See  CIRCUIT  ). 
    1. NG : Replace combination meter. 
    2. OK : Check and replace ECM (See  HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE  ).