Acc Cut Relay: Inspection
- REMOVE ACC CUT RELAY
- INSPECT ACC CUT RELAY
- Using an ohmmeter, check for continuity between each terminal.
Specified condition:
TERMINAL NUMBER AND SPECIFIED CONDITIONTerminal No. Specified condition 1-2 3-4 Continuity 3-5 No continuity - Using an ohmmeter, check for continuity between terminals 3 and 5 when the battery voltage is applied across terminals 1 and 2.
Specified condition: Continuity
- Using an ohmmeter, check for continuity between each terminal.
- INSTALL ACC CUT RELAY