FixVault

Acc Cut Relay: Inspection

  1. REMOVE ACC CUT RELAY 
  2. INSPECT ACC CUT RELAY 
    1. Using an ohmmeter, check for continuity between each terminal.

      Specified condition: 

      TERMINAL NUMBER AND SPECIFIED CONDITION

      Terminal No. Specified condition
      1-2 3-4 Continuity
      3-5 No continuity
    2. Using an ohmmeter, check for continuity between terminals 3 and 5 when the battery voltage is applied across terminals 1 and 2.
      Fig 1: Checking Continuity Between Terminals 3 And 5
      G02636174Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Specified condition: Continuity 

  3. INSTALL ACC CUT RELAY