FixVault

Mass Air Flow Meter: Installation

  1. INSTALL MASS AIR FLOW METER 
  2. INSTALL V-BANK COVER (See  INSTALLATION   ) 
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)