FixVault

Throttle Body: Installation

  1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY 
    1. Install a new gasket and the throttle with motor body with the 4 bolts.

      Torque: 11 N*m (112 kgf*cm, 9ft.*lbf) 

      Fig 1: Locating Throttle With Motor Body Bolts
      G04968658Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
    2. Connect the throttle motor connector.
    3. Connect the water bypass hose No. 4.
      Fig 2: Locating Water Bypass Hose No. 4
      G04968659Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
    4. Connect the water bypass hose No. 5.
      Fig 3: Locating Water Bypass Hose No. 5
      G04968654Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
  2. INSTALL AIR CLEANER ASSEMBLY 
    1. Install the air cleaner with the 2 bolts.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

    2. Tighten the 2 hose clamps.
      Fig 4: Locating Hose Clamps
      G04968661Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
    3. Install the 2 wire harness clamps.
      Fig 5: Locating Wire Harness Clamps
      G04968662Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
    4. Connect the mass air flow meter connector.
    5. Connect the vacuum hose.
    6. Connect the ventilation hose No. 2.
      Fig 6: Locating Ventilation Hose No. 2
      G04968651Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

  4. ADD ENGINE COOLANT  (See REPLACEMENT )
  5. CHECK FOR ENGINE COOLANT LEAKAGE  (See REPLACEMENT )
  6. INSTALL V-BANK COVER 
    1. Install the V-bank cover with the 2 nuts.

      Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf) 

      Fig 7: Locating V-Bank Cover Nuts
      G04968650Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.