FixVault

Front Stabilizer Bar: Inspection

  1. INSPECT FRONT STABILIZER LINK ASSEMBLY 
    1. Secure the front stabilizer link assembly LH in a vise.
    2. Install the nut to the stud bolt.
    3. Flip the ball joint back and forth 5 times or more.
    4. Use a torque wrench to turn the nut continuously at a rate of 2 to 4 seconds per 1 turn. Take the torque reading on the 5th turn.

      Torque: Turning torque 

      0.05 to 1.96 N*m (0.5 to 20 kgf*cm, 0.4 to 17.4 in.*lbf) 

      If the value is not within the specification, replace the front stabilizer link assembly with a new one.

    Fig 1: Inspecting Front Stabilizer Link Assembly
    G04949535Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002