Transmission Control Cable Assembly: Installation
- INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
- Install the shift cable grommet retainer No. 2 to the floor shift cable.
- Put in the control cable to the body.
- Install the floor shift cable as shown in the illustration.
HINT:
- Install it with the uneven surface facing up.
- Securely engage the claws.
- Connect the control cable to the control cable clamp.
- Temporarily install the transmission control cable assembly to the control shaft lever with the nut.
- Connect the transmission control cable assembly with a new clip to the bracket.
- Install the shift cable grommet retainer No. 2 with the 2 bolts.
Torque: 5.0 N*m (50 kgf*cm, 43 in.*lbf)
- INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER ASSEMBLY
HINT:
(See INSTALLATION )
- INSTALL AIR BAG SENSOR ASSEMBLY CENTER
HINT:
(See INSTALLATION )
- INSTALL CONSOLE BOX FRONT
HINT:
(See INSTALLATION )
- INSTALL CONSOLE BOX ASSEMBLY
HINT:
(See INSTALLATION )
- INSTALL CONSOLE PANEL SUB-ASSEMBLY UPPER
HINT:
(See INSTALLATION )
- INSTALL CONSOLE BOX UPPER
HINT:
(See INSTALLATION )
- INSTALL POSITION INDICATOR HOUSING ASSEMBLY
HINT:
(See INSTALLATION )
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
HINT:
(See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSPECT SHIFT LEVER POSITION (See ADJUSTMENT )
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )