FixVault

Light Control Rheostat: Installation

  1. INSTALL LIGHT CONTROL RHEOSTAT 
    1. Engage the 2 claws and install the light control rheostat.
    2. Connect the connector.
    3. Fig 1: Identifying Light Control Rheostat Claws
      G05114026Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY  (See INSTALLATION )
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)