Charging System (3MZ-FE): Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Temporarily install the generator with bolts A and B.
- Adjust the V belt tension by tightening bolt C (See INSTALLATION ).
- Tighten bolts A and B.
Torque:
Bolt A
58 N*m (592 kgf*cm, 43 ft.*lbf)
Bolt B
18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the generator wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 7.0 ft.*lbf)
- Connect the generator connector.
- Install the wire harness clamp.
- INSPECT V BELT (See ON-VEHICLE INSPECTION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL