FixVault

Throttle Body: Installation

  1. INSTALL THROTTLE BODY ASSEMBLY 
    1. Install a new gasket to the intake air connector.
    2. install the throttle body with the 2 bolts and 2 nuts.

      Torque: 11 N.m (112 kgf*cm, 8 ft.*lbf) 

      Fig 1: Locating Throttle Body With Bolts And Nuts
      G05245803Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the water by-pass hose No. 3.
    4. Connect the water by-pass hose No. 2.
    5. Connect the throttle control motor & throttle position sensor connector.
      Fig 2: Locating Throttle Position Sensor Connector
      G05245806Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL INTAKE AIR RESONATOR 
  3. INSTALL AIR CLEANER ASSEMBLY 
    1. Install the air cleaner assembly (See INSTALLATION ).
  4. INSTALL AIR CLEANER INLET ASSEMBLY 
    1. Install the air cleaner inlet assembly (See INSTALLATION ).
  5. CHECK CONNECTION OF VACUUM HOSE 
    1. Check the connection of vacuum hose (See INSTALLATION ).
  6. ADD ENGINE COOLANT  (See ON-VEHICLE INSPECTION )
  7. CHECK ENGINE COOLANT LEAK  (See ON-VEHICLE INSPECTION )
  8. INSTALL V-BANK COVER SUB-ASSEMBLY 
    1. Fit the 2 retainers and install the V-bank cover.
    2. Using a socket hexagon wrench 5, tighten the 3 nuts.

      Torque: 7.9 N.m (81 kgf*cm, 70 in.*lbf) 

      Fig 3: Locating V-Bank Cover Nuts
      G05245800Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  9. INSTALL FRONT SUSPENSION BRACE SUB-ASSEMBLY UPPER CENTER 
    1. Install the upper brace with the 2 nuts.

      Torque: 80 N.m (815 kgf*cm, 59 ft.*lbf)