Park/ Neutral Position Switch: Installation
- INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Install the park/neutral position switch to the manual valve shaft.
- Temporarily install the 2 bolts.
- Place a new lock plate and tighten the nut.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Temporarily install the control shaft lever.
- Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
- Remove the control shaft lever.
- Align the groove with the neutral basic line.
- Hold the switch in position and tighten the 2 bolts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Using a screwdriver, stake the nut with the lock plate.
- Install the control shaft lever, washer and nut.
Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf)
- Connect the park/neutral position switch connector.
- INSTALL TRANSMISSION CONTROL ASSEMBLY
- Temporarily install the control cable to the control shaft lever with the nut.
- Install the control cable with the clip to the bracket.NOTE: Insert the cable securely.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSTALL BATTERY CARRIER
- Install the battery carrier with the 4 bolts.
Torque: 13 N*m (132 kgf*cm, 10 ft.*lbf)
- Install the battery carrier with the 4 bolts.
- INSTALL BATTERY
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (See ADJUSTMENT )