FixVault

Power Switch: Installation

  1. INSTALL POWER SWITCH 
    1. Install the power switch to the upper finish panel.
  2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (See  INSTALLATION  ) 
  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY (See  INSTALLATION  ) 
  4. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY (See  INSTALLATION  ) 
  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See  INSTALLATION  ) 
  6. INSTALL REAR NO. 3 FLOOR BOARD (See  INSTALLATION  ) 
  7. INSTALL REAR DECK FLOOR BOX (See  INSTALLATION  ) 
  8. INSTALL REAR NO. 2 FLOOR BOARD (See  INSTALLATION  ) 
  9. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.