FixVault

Transmission Control Cable: Installation

  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Install the control cable with the 3 nuts.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

      Fig 1: Installing Transmission Control Cable
      G04831644Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the control shift cable onto the shift lever retainer.
      NOTE:
      • Install the cable with the protruding portion of the cable outer facing upward.
      • After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in Fig 2 .
    3. Connect the control shift cable to the shift lever.
    4. Install the control shift cable onto the control cable bracket with a new clip.
    5. Connect the control shift cable to the transaxle through the washer.
    6. Install the control select cable onto the shift lever retainer.
      Fig 2: Connecting Control Shift Cable To Shift Lever
      G04831636Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      NOTE:
      • Install the cable with the protruding portion of the cable outer facing upward.
      • After installing, check that the lock of the cable outer is protruding beyond portion A.
        Fig 3: Connecting Control Shift Cable To Shift Lever
        G04831637Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Connect the control select cable to the shift lever with the clip.
      NOTE:
      • Connect the control select cable so that the adjusting mechanism lock of the control select cable is installed on the left side of the vehicle.
      • Insert the clip in the direction shown.
        Fig 4: Connecting Control Select Cable To Shift Lever
        G04831638Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Install the control select cable onto the control cable bracket with a new clip.
    9. Connect the control select cable to the transaxle through the washer.
    10. Adjust the length of the control select cable.
      1. Slide the adjuster case cover in the direction shown in Fig 5 (A).
      2. Gently pull the cable rod toward the rear of the vehicle by hand to pull the cable taut.
      3. Press the lock piece into the adjuster case and lock it (B).
      4. Slide the cover in the direction shown in Fig 5 (C).
        NOTE: Slide the cover past the protrusion portion of the lock piece (D).
  2. INSTALL FRONT FLOOR HEAT INSULATOR NO.1 
    1. Install floor heat insulator No. 1 with the 2 bolts and nut.

      Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf) 

  3. INSTALL EXHAUST PIPE ASSEMBLY FRONT (See  INSTALLATION  ) 
  4. CONNECT OXYGEN SENSOR CONNECTOR 
  5. INSTALL CONSOLE BOX ASSEMBLY REAR (for Hatchback) (See  INSTALLATION  ) 
  6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Hatchback) (See  INSTALLATION  ) 
    Fig 5: Identifying Adjuster Case Cover
    G04831649Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  7. INSTALL REAR CONSOLE BOX ASSEMBLY (for Sedan) (See  INSTALLATION  ) 
  8. INSTALL CONSOLE BOX CARPET (for Sedan) (See  INSTALLATION  ) 
  9. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Sedan) (See  INSTALLATION  ) 
  10. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for Sedan) (See  INSTALLATION  ) 
  11. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Sedan) (See  INSTALLATION  ) 
  12. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER (for Sedan) (See  INSTALLATION  ) 
  13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)