FixVault

Throttle Body: Removal

  1. DRAIN ENGINE COOLANT  (See REPLACEMENT )
  2. REMOVE FRONT SUSPENSION UPPER BRACE CENTER 
    1. Remove the 2 nuts and upper brace.
  3. REMOVE V-BANK COVER SUB-ASSEMBLY 
    1. Using a 5 mm socket hexagon wrench, remove the 3 nuts.
    2. Remove the V-bank cover.
      Fig 1: Identifying V-Bank Cover Sub-Assembly Nuts
      G05245800Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. REMOVE AIR CLEANER INLET ASSEMBLY 
  5. REMOVE AIR CLEANER ASSEMBLY 
  6. REMOVE INTAKE AIR RESONATOR 
    1. Remove the ventilation hose No. 2.
    2. Remove the fuel vapor feed hose from the 2 hose clamps.
    3. Loosen the air cleaner hose clamp bolt, and then remove the intake air resonator.
      Fig 2: Identifying Air Cleaner Hose Clamp Bolt
      G05128721Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  7. REMOVE THROTTLE BODY ASSEMBLY 
    1. Disconnect the throttle control motor & throttle position sensor connector.
    2. Disconnect the water by-pass hose No. 2.
    3. Fig 3: Identifying Water By-Pass Hose
      G05128722Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Disconnect the water by-pass hose No. 3.
    5. Remove the 2 bolts, 2 nuts and throttle body.
    6. Fig 4: Identifying Throttle Body Nuts And Bolts
      G05245803Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Remove the gasket.