Inspection Procedure
HINT:
Start the inspection from step 1 when using Techstream and start from step 2 when not using Techstream.
- CHECK DTC
B: REPAIR CIRCUITS INDICATED BY OUTPUT DTCS
A: Go to Next Step
- CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - COMBINATION METER)
- Disconnect the skid control ECU connector.
- Disconnect the combination meter connector.
- Measure the resistance.
Standard
RESISTANCE SPECIFICATIONTester Connection Specified Condition S1-34 (IND) - C9-36 Below 1 Ω - Measure the resistance.
Standard
RESISTANCE SPECIFICATIONTester Connection Specified Condition S1-34 (IND) - Body ground 10 kΩ or higher - Reconnect the combination meter connector.
- Reconnect the skid control ECU connector.
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go to Next Step
- INSPECT COMBINATION METER ASSEMBLY
- Check the combination meter system. (See COMBINATION METER
).
OK: Combination meter is normal.
NG: REPLACE COMBINATION METER ASSEMBLY
OK: REPLACE MASTER CYLINDER SOLENOID
- Check the combination meter system. (See COMBINATION METER
).