FixVault

Inspection Procedure

HINT:

Start the inspection from step 1 when using Techstream and start from step  2 when not using Techstream.

  1. CHECK DTC 
    1. Check the DTCs.
      DTC OUTPUT REFERENCE

      Result Proceed To
      DTC not output A
      DTC output B

    B: REPAIR CIRCUITS INDICATED BY OUTPUT DTCS 

    A: Go to Next Step 

  2. CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - COMBINATION METER) 
    1. Disconnect the skid control ECU connector.
    2. Disconnect the combination meter connector.
    3. Measure the resistance.

      Standard 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition
      S1-34 (IND) - C9-36 Below 1 Ω
    4. Measure the resistance.

      Standard 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition
      S1-34 (IND) - Body ground 10 kΩ or higher
    5. Reconnect the combination meter connector.
    6. Reconnect the skid control ECU connector.

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Fig 1: Identifying Combination Meter & Skid Control ECU Connectors
    G05199322Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK: Go to Next Step 

  3. INSPECT COMBINATION METER ASSEMBLY 
    1. Check the combination meter system. (See COMBINATION METER ).

      OK: Combination meter is normal. 

    NG: REPLACE COMBINATION METER ASSEMBLY 

    OK: REPLACE MASTER CYLINDER SOLENOID