Throttle Body: Installation
- INSTALL THROTTLE BODY
- Install a new gasket onto the intake manifold.
- Connect the purge line hose to the throttle body.
- Connect the water by-pass hose to the throttle body.
- Connect the No. 2 water by-pass hose to the throttle body.
- Connect the No. 1 throttle body hose to the throttle body.
- Install the throttle body and fuel pipe clamp with the 4 bolts.
Torque: 30 N*m (305 kgf*cm, 22 ft.*lbf)
- Connect the fuel tube into the clamp.
- Connect the throttle position sensor connector.
- Connect the wire harness clamp.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
- Install the air cleaner filter element onto the air cleaner case.
- Insert the hinges. Install the air cleaner cap sub-assembly with the 2 bolts.
- Align the matchmarks of the No. 1 air cleaner hose and throttle body. Connect the air cleaner hose No. 1 to the throttle body and unfasten the No. 1 air cleaner hose clamp.NOTE: Make sure that the hose clamp is at the correct angle.
- Connect the No. 2 ventilation hose to the air cleaner hose.
- Connect the purge line hose to the clamp (*1).
- Connect the 2 purge VSV vacuum hoses (*2).
- Connect the purge VSV connector (*3).
- Connect the mass air flow meter connector (*4).
- INSTALL AIR CLEANER INLET ASSEMBLY (See INSTALLATION )
- ADD COOLANT (for Engine) (See COOLANT (FOR ENGINE) )
- INSPECT FOR COOLANT LEAK (for Engine) (See ON-VEHICLE INSPECTION )
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (See INSTALLATION )