FixVault

Meter / Gauge / Display: Clock: Installation

  1. INSTALL CLOCK ASSEMBLY 
    1. Engage the 2 claws and install the clock assembly.
  2. INSTALL AIR CONDITIONING PANEL ASSEMBLY  (See INSTALLATION )
  3. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (for Manual Transaxle)  (See INSTALLATION )
  4. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (for Automatic Transaxle)  (See INSTALLATION )
  5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)  (See INSTALLATION )
    Fig 1: Identifying Clock Assembly And Claws
    G06036689Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Automatic Transaxle)  (See INSTALLATION )
  7. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY  (See INSTALLATION )