Steering Gear: Inspection
- INSPECT TIE ROD END SUB-ASSEMBLY LH
- Secure the tie rod end LH boll join in a vise through aluminum plates.NOTE: Do not overtighten the vise.
- Install the castle nut to the stud bolt.
- Flip the ball joint back and forth 5 times or more.
- Set a torque wrench to the nut, turn the ball joint continuously at a rate of 3 to 5 seconds per turn, and check the turning torque on the 5th turn.
Standard turning torque: 2.0 N*m (20.4 kgf*cm, 18 in. lbf) or less
If turning torque is out of specification, replace the tie rod end LH with a new one.
- Secure the tie rod end LH boll join in a vise through aluminum plates.
- INSPECT TIE ROD END SUB-ASSEMBLY RH
HINT:
Use the same procedures described for the LH side.
- INSPECT TOTAL PRELOAD
- Using SST, inspect the total preload.
SST 09616-00011
Standard total preload (turning): 0.6 to 1.2 N*m (6.2 to 12.2 kgf*cm, 5 to 11 in.*lbf)
NOTE: Inspect around the steering rack center position.If the total preload is out of specification, replace the steering gear with a new one.
- Using SST, inspect the total preload.