FixVault

Combination Meter: Installation

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connector.
    2. Attach the 2 clips to install the combination meter.
    3. Install the 2 screws.
      Fig 1: Identifying Combination Meter Clips
      G05586227Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 
    1. Attach the 4 clips and 6 claws to install the instrument cluster finish panel.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  4. CHECK SRS WARNING LIGHT 
    1. Check the SRS warning light (see DIAGNOSIS SYSTEM ).
      Fig 2: Identifying Instrument Cluster Finish Panel Clips And Claws
      G05586225Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002