FixVault

Light Control Rheostat: Installation: Installation

  1. INSTALL LIGHT CONTROL RHEOSTAT 
    Fig 1: Identifying Light Control Rheostat Connector
    GTY206892Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Engage the 2 claws and install the light control rheostat.
    2. Connect the connector.
  2. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY  . Refer to INSTALLATION - Step 35
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)