FixVault

Power Switch: Installation: Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL POWER SWITCH 
    1. Attach the 2 claws to install the power switch.
  2. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY  . Refer to INSTALLATION - Step 27
  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH  . Refer to INSTALLATION - Step 28
  4. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY  . Refer to INSTALLATION - Step 30
  5. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY  . Refer to INSTALLATION - Step 31
  6. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .

  7. INSTALL DECK FLOOR BOX RH  . Refer to INSTALLATION - Step 54
  8. INSTALL REAR NO. 3 FLOOR BOARD  . Refer to INSTALLATION - Step 55