FixVault

Mass Air Flow Meter: Installation: Installation

  1. INSTALL MASS AIR FLOW METER 
  2. INSTALL V-BANK COVER  See step  6
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)