Installation [06/2016 - ]: Procedure
- INSTALL POWER WINDOW REGULATOR SWITCH ASSEMBLY
- INSTALL POWER WINDOW REGULATOR SWITCH ASSEMBLY WITH FRONT DOOR ARMREST BASE PANEL
Refer to PROCEDURE - Step 31 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 32 [03/2017 - 12/2017] , or refer to PROCEDURE - Step 32 [12/2017 - ]
- INSTALL FRONT DOOR TRIM BOARD SUB-ASSEMBLY RH
HINT:
Use the same procedure as for the LH side (Refer to PROCEDURE - Step 33 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 34 [03/2017 - 12/2017] , or refer to PROCEDURE - Step 34 [12/2017 - ] ).
- INSTALL DOOR ARMREST COVER RH
HINT:
Use the same procedure as for the LH side (Refer to PROCEDURE - Step 34 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 35 [03/2017 - 12/2017] , or refer to PROCEDURE - Step 36 [12/2017 - ] ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- INITIALIZE POWER WINDOW CONTROL SYSTEM
(Refer to INITIALIZATION [06/2016 - ] )
- INSPECT POWER WINDOW (POWER WINDOW OPERATION)
(Refer to INSPECTION [06/2016 - ] )