FixVault

Installation [09/2016 - ]: Procedure

  1. INSTALL VSC OFF SWITCH (COMBINATION SWITCH ASSEMBLY) 
    1. Engage the 3 claws to install the VSC OFF switch (combination switch assembly) to the instrument cluster finish panel garnish assembly.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY 

    Refer to PROCEDURE - Step 26 [09/2016 - 05/2019] , or refer to PROCEDURE - Step 26 [05/2019 - ]