FixVault

Installation [08/2015 - ]: Procedure

  1. INSTALL DRIVE MONITOR SWITCH (CRAWL CONTROL SWITCH AND MULTI-TERRAIN SELECT SWITCH) 
    1. Connect the connector.
    2. Attach the 4 claws to install the drive monitor switch (CRAWL control switch and multi-terrain select switch).
  2. PERFORM CRAWL CONTROL CALIBRATION 
    1. Perform crawl control calibration (Refer to CALIBRATION [08/2015 - 08/2019] , or refer to CALIBRATION [08/2019 - ] ).