FixVault

Installation [08/2015 - ]: Procedure

  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 
    1. Attach the 10 claws and install the integration control and panel assembly to the upper console panel.
      GTY551458Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL POSITION INDICATOR HOUSING ASSEMBLY 
    1. Attach the 3 claws to the upper console panel, and then install the position indicator housing assembly with the 2 screws.
      GTY599602Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL UPPER CONSOLE PANEL 

    (Refer to INSTALLATION [08/2015 - ] )