FixVault

Inspection [11/2018 - ]: Procedure

  1. CHECK INTEGRATION CONTROL & PANEL ASSEMBLY (DOWNHILL ASSIST CONTROL SWITCH) 
    1. Measure the resistance according to the value(s) in the table below.
      GTY857190Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Component without harness connected
      (Downhill Assist Control Switch)

      Standard Resistance

      Tester Connection Switch Condition Specified Condition
      16 (E) - 19 (B) Switch pushed Below 1 Ω
      Switch not pushed 10 kΩ or higher

      HINT: 

      If the result is not as specified, replace the integration control and panel assembly (downhill assist control switch).