Removal Procedure
- Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure (RPOs LZE/LZ4/LZ9) or Battery Negative Cable Disconnect/Connect Procedure (RPO LS4) in Engine Electrical.
- Remove the left instrument panel (I/P) insulator. Refer to Closeout/Insulator Panel Replacement - Left in Instrument Panel, Gages, and Console.
- Remove the screws from the accessory wiring junction block.
- Adjust the junction block for access.
- Remove the circuit breakers (4) and the relays from the junction block as required. Refer to Relay Replacement (Within an Electrical Center) or Relay Replacement (Attached to Wire Harness) .
- If necessary remove the junction block from the bracket assembly.