FixVault
Home
›
Ford
›
2011
›
Explorer Base, AWD, 6F55
›
Repair and Diagnosis
›
Engine Mechanical
›
Cooling System (Mechanical)
›
Engine Cooling
Engine Cooling
Expand All (for easy ctrl-f)
Collapse All
Specifications
Engine Cooling
Material(s)
Torque Specifications
General Specifications
Description And Operation
Engine Cooling
Overview
System Operation
System Diagram
DTC And Symptom Chart (S)
Related Module DTC Chart(s)
Related Module DTC Chart(s)
Symptom chart(s)
Symptom Chart: Engine Cooling
Notes
Inspection and Verification
Diagnostic Routine (S)
Notes
Diagnostic Routine A
Diagnostic Overview
Loss of Coolant
Normal Operation and Fault Conditions
Special Tool(s)
Material(s)
Pinpoint Test
Diagnostic Routine B
Diagnostic Overview
P0217, P1285, P1299
Normal Operation and Fault Conditions
Special Tool(s)
Material(s)
Pinpoint Test
Diagnostic Routine C
Diagnostic Overview
P0125, P0128
Normal Operation and Fault Conditions
Special Tool(s)
Pinpoint Test
Component Test (S)
Cooling System Pressure Test
Special Tool(s)
Material(s)
Component Test
Thermostat
Component Test
Radiator Leak Test, Removed From Vehicle
Component Test
General Procedures
Cooling System Draining, Filling and Bleeding
Special Tool(s)
Material(s)
Draining
Filling and Bleeding
Cooling System Flushing
Material(s)
General Procedure
Removal And Installation
Block Heater
Exploded View
Removal
Installation
Radiator - 3.5L Ti-VCT
Exploded View
Removal
Installation
Cooling Fan Motor and Shroud - 3.5L Ti-VCT
Exploded View
Removal
Installation
Degas Bottle
Material(s)
Exploded View
Removal
Installation
Thermostat - 3.5L Ti-VCT
Material(s)
Exploded View
Removal
Installation
Thermostat Housing - 3.5L Ti-VCT
Material(s)
Exploded View
Removal
Installation
Coolant Pump - 3.5L Ti-VCT
Special Tool(s)
Material(s)
Exploded View
Removal
Installation
Coolant Inlet Pipe - 3.5L Ti-VCT, Early Build
Coolant Inlet Pipe - 3.5L Ti-VCT, Early Build
Material(s)
Exploded View
Removal
Installation
Coolant Inlet Pipe - 3.5L Ti-VCT, Late Build
Coolant Inlet Pipe - 3.5L Ti-VCT, Late Build
Material(s)
Exploded View
Removal
Installation