FixVault

Current Pump Circuit Inspection

  1. IG "OFF" & Disconnect HO2S (S1) connector.
  2. Measure the resistance between both ends of the HO2S (S1) Current Pump terminal harness.

    Specification:  Approx. 0Ω

  3. Is the measured resistance within specification?

    YES 

    NO