FixVault

Work Procedure

  1. LASER BEAM AIMING ADJUSTMENT 

    Adjust the laser beam aiming. Refer to "DESCRIPTION ".

    : GO TO 2.

  2. ICC SYSTEM ACTION TEST 
    1. Perform the ICC system action test. Refer to "DESCRIPTION ".
    2. Check that the ICC system operates normally.

      : INSPECTION END