FixVault

2.2L Diesel

  1. Clean the gasket sealing surfaces.
    GC0162240Courtesy of CHRYSLER GROUP, LLC
  2. Using a NEW  gasket seals, install the thermostat housing (1a). Tighten the bolts (1b) to the proper torque. Refer to TECHNICAL SPECIFICATIONS .
    GC0162204Courtesy of CHRYSLER GROUP, LLC
  3. Install the bolts (1) securing the EGR tubes to the thermostat housing and tighten to the proper torque. Refer to TECHNICAL SPECIFICATIONS .
    GC0162330Courtesy of CHRYSLER GROUP, LLC
  4. Connect the coolant temperature sensor wire harness connector wire harness connector (1).
    GC0162306Courtesy of CHRYSLER GROUP, LLC
  5. Attach the wire harness connector to the bracket and connect the front oxygen sensor wire harnessconnector (1).
    GC0162205Courtesy of CHRYSLER GROUP, LLC
  6. Install the upper radiator hose (2) onto the thermostat housing and tighten the clamp.
  7. Install the degas hose (1) onto the thermostat housing and tighten the clamp.
    GC0162278Courtesy of CHRYSLER GROUP, LLC
  8. Install the coolant hose (1) and tighten the clamp.
    GC0162333Courtesy of CHRYSLER GROUP, LLC
  9. Using a NEW  O-ring seal, install the left charge Air Cooler (CAC) tube (1b). Tighten the bolts (1a) to the proper (Torque Specifications).
    GC0162295Courtesy of CHRYSLER GROUP, LLC
  10. Connect the vacuum brake booster hose (1b) quick-disconnect fitting (1b) and close the retaining clip (1a).
    GC0162269Courtesy of CHRYSLER GROUP, LLC
  11. Install the bolt securing the left CAC tube. Tighten the bolts to the proper torque. Refer to the appropriate service information article. .
  12. Fill the cooling system. Refer to STANDARD PROCEDURE .
  13. Install the belly pan Refer to BELLY PAN, INSTALLATION .
  14. Install the engine cover. Refer to the appropriate service information article.
  15. Install the battery tray. Refer to BATTERY, INSTALLATION .
  16. Run engine to operating temperature and check for leaks.