Transmission Control Switch: Installation

  1. INSTALL TRANSMISSION CONTROL SWITCH 
    1. Install the transmission control switch to the shift lever guide housing.

      HINT:

      Securely engage the claws.

      Fig 1: Identifying Transmission Control Switch
      G05288279Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Apply MP grease to the shaded area of the shift lever guide housing as indicated in the illustration.
      Fig 2: Identifying MP Grease Applying Area
      G05294813Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the shift lever guide housing with the shift lever lock pin and a new shift lever nut.
      NOTE:
      • Install the shift lever nut and lock pin after first engaging the 2 claws.
      • Securely engage the claws.
        Fig 3: Identifying Floor Shift Assembly With Lock Pin
        G05288276Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the transmission control switch connector to the floor shift assembly.
      Fig 4: Identifying Transmission Control Switch Connector
      G05305140Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY (See  INSTALLATION   ) 
  3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY (See  INSTALLATION   ) 
  4. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR  (See INSTALLATION )
  5. INSTALL FRONT FLOOR COVER CENTER RH 
    1. Install the front floor cover center RH with the 3 grommets.

      Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

      Fig 5: Locating Front Floor Cover Center RH Grommets
      G04978792Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. INSTALL FRONT EXHAUST PIPE ASSEMBLY  (See INSTALLATION )
  7. INSTALL REAR FLOOR NO. 1 PANEL BRACE  (See INSTALLATION )
  8. INSTALL FRONT FLOOR BRACE CENTER  (See INSTALLATION )
  9. INSTALL HEATED OXYGEN SENSOR 
    1. Install the heated oxygen sensor (see INSTALLATION ).
  10. INSTALL NO. 2 CONSOLE BOX DUCT  (See INSTALLATION )
  11. INSTALL CONSOLE BOX ASSEMBLY  (See INSTALLATION )
  12. INSTALL CONSOLE BOX REGISTER ASSEMBLY  (See INSTALLATION )
  13. INSTALL CONSOLE BOX PLATE  (See INSTALLATION )
  14. INSTALL INSTRUMENT PANEL FINISH PANEL END LH  (See INSTALLATION )
  15. INSTALL INSTRUMENT PANEL FINISH PANEL END RH  (See INSTALLATION )
  16. INSTALL UPPER CONSOLE PANEL ASSEMBLY  (See INSTALLATION )
  17. INSTALL FRONT CONSOLE UPPER PANEL GARNISH  (See INSTALLATION )
  18. INSTALL SHIFT LEVER KNOB (See  INSTALLATION   ) 
  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  20. INSTALL BATTERY SERVICE HOLE COVER LH  (See INSTALLATION )
  21. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 
  22. INSPECT SHIFT LEVER POSITION (See  REASSEMBLY   ) 
  23. ADJUST SHIFT LEVER POSITION (See  ADJUSTMENT   ) 
  24. INSPECT SHIFT LEVER OPERATION (See  ADJUSTMENT   ) 
  25. CHECK FOR EXHAUST GAS LEAKS  (See INSTALLATION )
  26. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION (2006/02-2006/07) ).
      NOTE: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.