FixVault

Park / Neutral Position Switch: Installation

  1. INSTALL NEUTRAL START SWITCH ASSEMBLY 
    1. Install the park/neutral position switch to the manual valve shaft.
    2. Temporarily install the bolt.
      Fig 1: Locating Park/Neutral Position Switch Connector
      G05802757Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install a new lock washer with the lock nut.

      Torque: 6.9 N*m (70 kgf*cm, 61 in.*lbf) 

      Fig 2: Locating Lock Washer With Lock Nut
      G05294774Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Turn the control shaft lever counterclockwise until it stops, and turn it clockwise 2 notches to set it to the neutral position.
    5. Remove the transmission control shaft lever.
      Fig 3: Positioning Transmission Control Shaft
      G05294775Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Align the neutral basic line with the switch groove, and tighten the bolt.

      Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf) 

      Fig 4: Aligning Neutral Basic Line With Switch Groove
      G05294776Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Using a screwdriver, bend the tabs of the lock washer.
      Fig 5: Bending Tabs Of Lock Washer
      G05802761Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Connect the neutral start switch connector to the neutral start switch.
  2. INSTALL ENGINE REAR MOUNTING MEMBER  (See INSTALLATION  )
  3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY  (See INSTALLATION  )
  4. INSTALL PROPELLER W/CENTER BEARING SHAFT ASSEMBLY 

    (See REMOVAL )

    Fig 6: Locating Neutral Start Switch Connector
    G05802752Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  6. INSPECT NEUTRAL START SWITCH ASSEMBLY  (See INSPECTION  )
  7. ADJUST SHIFT LEVER POSITION  (See ADJUSTMENT  )
  8. INSPECT SHIFT LEVER POSITION  (See INSPECTION  )
  9. INSTALL FRONT FLOOR HEAT INSULATOR NO.1  (See INSTALLATION )
  10. INSTALL EXHAUST PIPE NO.1 SUPPORT BRACKET SUB-ASSEMBLY  (See INSTALLATION  )
  11. INSTALL FRONT EXHAUST PIPE ASSEMBLY 

    (See INSTALLATION )

  12. CHECK FOR EXHAUST GAS LEAKS 
  13. PERFORM INITIALIZATION 

    (See INITIALIZATION )