Manual Transaxle Overhaul
- General Description
- General Specifications
- Service Specifications
- Shim And Snap Ring For Adjustment
- Adjustment Shims (For Input Shaft Radial Ball Bearing Axial Play Adjustment)
- Adjustment Shims (For Differential Side Tapered Roller Bearing Preload Adjustment)
- Adjustment Shims (For Output Shaft Tapered Roller Bearing Preload Adjustment)
- Snap Rings (For Input Shaft Synchronizer Number 2 Assembly Axial Play Adjustment, And Output Shaft Synchronizer Number 1 Assembly Axial Play Adjustment)
- Snap Rings (For Input Shaft 4TH Gear Sub-Assembly Axial Play Adjustment)
- Snap Rings (For Output Shaft 5TH Driven Gear Axial Play Adjustment)
- Torque Specifications
- Lubricants
- Sealants And Adhesives
- Special Tools
- Transaxle
- Disassembly And Assembly
- Notes
- Disassembly Service Points
- Adjustment Before Assembly Selecting The Input Shaft Radial Ball Bearing Axial Play Adjustment Shim
- Assembly Service Points
- >>A<< Output Shaft Assembly/Input Shaft Assembly Installation
- >>B<< Straight Pin/Slotted Spring Pin Installation
- >>C<< Reverse Idler Gear Sub-Assembly/Reverse Idler Gear Shaft Installation
- >>D<< Shim (Input Shaft Radial Ball Bearing Axial Play Adjustment) Installation
- >>E<< Transaxle Case Assembly Installation
- >>F<< Flange Bolt Installation
- >>G<< Shift And Select Lever Shaft Assembly Installation
- >>H<< Back-Up Light Switch Installation
- Inspection
- Disassembly And Assembly
- Input Shaft
- Disassembly And Assembly
- Notes
- Disassembly Service Points
- Assembly Service Points
- >>A<< Radial Ball Bearing Installation
- >>B<< Synchronizer Ring Number 2/Synchronizer Hub Sleeve Number 2/Synchromesh Shifting Key Number 2 Spring/Synchronizer Clutch Hub Number 2/Synchromesh Shifting Key Number 2 Installation
- >>C<< Snap Ring Installation
- >>D<< Snap Ring Installation
- >>E<< Ball Installation
- >>F<< Synchronizer Ring Number 3/Synchronizer Hub Sleeve Number 3/Synchromesh Shifting Key Number 3 Spring/Synchronizer Clutch Hub Number 3/Synchromesh Shifting Key Number 3 Installation
- >>G<< Radial Ball Bearing Installation
- Inspection
- Disassembly And Assembly
- Output Shaft
- Disassembly And Assembly
- Notes
- Disassembly Service Points
- Assembly Service Points
- >>A<< Tapered Roller Bearing Installation
- >>B<< Synchronizer Ring Number 1/Reverse Gear/Synchromesh Shifting Key Number 1 Spring/Synchronizer Clutch Hub Number 1/Synchromesh Shifting Key Number 1 Installation
- >>C<< Snap Ring Installation
- >>D<< 3RD Driven Gear Installation
- >>E<< 4TH Driven Gear Installation
- >>F<< 5TH Driven Gear Installation
- >>G<< Snap Ring Installation
- >>H<< Tapered Roller Bearing Installation
- Inspection
- Disassembly And Assembly
- Control Housing
- Clutch Housing
- Transmission Case
- Disassembly And Assembly
- Notes
- Disassembly Service Points
- Adjustment Before Reassembly Differential Side Bearing Preload Adjustment
- Output Shaft Assembly Bearing Preload Adjustment
- Assembly Service Points
- >>A<< Oil Seal Installation
- >>B<< Shim (Differential Side Tapered Roller Bearing Preload Adjustment) Installation
- >>C<< Tapered Roller Bearing (Outer Race) Installation
- >>D<< Shim (Output Shaft Tapered Roller Bearing Preload Adjustment) Installation
- >>E<< Tapered Roller Bearing (Outer Race) Installation
- Disassembly And Assembly
- Differential