FixVault

Oil Charge Pipe: Installation

  1. Install the oil charge pipe with a new O-ring.

    Tightening torque: 

    41 N.m (4.2 kgf-m, 30.4 ft-lb) 

    Fig 1: Installing Oil Charge Pipe
    G03831737Courtesy of SUBARU OF AMERICA, INC.
  2. Install the intercooler. (Turbo model) < Ref. to , INSTALLATION , lntercooler. >
  3. Install the air intake chamber. (Non-turbo model) < Ref. to , INSTALLATION , Air Intake Chamber. >